Mixed-use commercial fit-out
ConstructionEric Wright Group

Mixed-use commercial fit-out

£1.4M contractPrincipal contractorStage 5/6
Contract value

£1.4M

Full M&E electrical package delivered as specialist subcontractor to Eric Wright Group on a fast-track commercial programme.

Floors served

6

LV distribution, lighting controls and data infrastructure across all six storeys, plus a full basement plant room installation.

EV-ready bays

32

Future-proof EV charging infrastructure installed across the car park to landlord spec, with capacity for full smart charging activation.

The Brief

As M&E electrical subcontractor to Eric Wright Group, Con-Tec delivered the complete electrical package for a 6-storey mixed-use commercial development — from LV distribution through to lighting controls, data infrastructure and a future-ready EV charging strategy across a £1.4M scope.

Principal Contractor Interface

Working directly to Eric Wright Group as principal contractor, our team managed all electrical trade coordination including containment routes, structural penetrations and builder's work. Weekly design coordination meetings ensured the electrical package remained aligned with architectural and M&E changes throughout the Stage 5/6 programme.

LV distribution installation on a commercial office development

LV Distribution and Controls

Main LV switchboard, tenant distribution boards, landlord-controlled lighting circuits and BMS integration were all delivered to the landlord specification, with full metering at each tenancy level. A 32-point EV-ready infrastructure was installed to future-proof the car park for anticipated tenant charging demand.

Commercial office fit-out electrical containment installation
A clean, well-coordinated package from subcontractor through to final test — exactly what a £1.4M electrical scope on a fast-track commercial programme needs.

Eric Wright Group Site Manager

Distribution board installation during commercial fit-out
Emergency lighting commissioning on a commercial development

Delivered on Programme

Final energisation was achieved on the agreed date, enabling the developer's practical completion milestone. Full O&M documentation, test certificates and as-installed drawings were submitted within two weeks of completion.