Con-Tec Solutions

Testing & Compliance Service

Remedial Works

Targeted remedial works following EICR findings — C1 dangerous and C2 potentially dangerous defect clearance, distribution board upgrades, circuit replacement and BS 7671 re-certification.

What electrical remedial works actually have to deliver

01

C1 dangerous findings that require immediate action

C1 observations present a risk of injury and must be addressed without delay. We provide a rapid response to C1 defect clearance — assessing the site, producing a scope and commencing works within a timeframe that removes the immediate danger.

02

A remedial schedule from an EICR you didn't commission

We carry out remedial works from EICRs produced by other inspectors, not just our own. We review the report, interpret the findings against the current installation and produce an accurate scope before any works commence.

03

Prioritising a large remedial schedule against a limited budget

Not every remedial programme can be addressed at once. We work with the estate manager to sequence C1 and C2 works against the available budget, providing interim risk control measures where necessary while the remedial programme is phased.

04

Re-certification after works are complete

Remedial works must be re-tested and an updated EICR or minor works certificate issued. We provide this documentation as a matter of course — so the building's compliance record is closed out at the end of every remedial visit.

NHS
Eric Wright Group
Lancaster University
Bowmer + Kirkland
Conlon Construction
Casey
Barnfield
Caddick
Northern Care Alliance
Manchester Airports Group
NHS
Eric Wright Group
Lancaster University
Bowmer + Kirkland
Conlon Construction
Casey
Barnfield
Caddick
Northern Care Alliance
Manchester Airports Group

Technical detail

Standards & compliance

  • BS 7671 18th Edition — remedial circuit works
  • IET Guidance Note 3 — re-inspection after remedials
  • NICEIC certification for all completed works
  • Minor works certificates for individual circuit remedials
  • Electrical Installation Certificate (EIC) for new circuits

Common remedial scope

  • Distribution board and consumer unit replacement
  • RCD and RCBO protection upgrades
  • Earthing conductor and bonding replacements
  • Socket outlet and switch replacement
  • Cable and containment defect clearance

Specialist remedials

  • Deteriorated MICC cable replacement
  • Rewire of specific circuits or zones
  • Earth electrode installation and testing
  • Surge protection device (SPD) installation
  • Arc fault detection device (AFDD) installation

Documentation

  • Updated EICR or satisfactory partial re-test certificate
  • Minor works certificates for each remedial item
  • Updated circuit schedule at completion
  • Photographic record of defect and remedial
  • Risk assessment and method statement (RAMS) provision
Con-Tec Solutions — electrical remedial works

The Numbers

Dangerous — immediate response

C1

C1 observations present a risk of injury. We provide a rapid response scope and commencement to remove the immediate danger without delay.

Potentially dangerous — programmed response

C2

C2 observations must be addressed within a reasonable period. We plan C2 remedials into a programmed schedule with interim risk controls where required.

Re-certification at completion

100%

Every remedial visit closes with updated certification — minor works certificate, partial re-test or updated EICR depending on the scope.

Why specify Con-Tec

Remedials Done, Records Closed

01

C1 rapid response

Dangerous findings require a response that removes the risk within the shortest practicable time. We provide a prioritised scope and fast commencement for all C1 defects.

02

Works from any EICR

We carry out remedial works from reports we didn't commission — reviewing the findings independently and producing an accurate scope before any work begins.

03

Phased programme management

Large remedial schedules are prioritised, sequenced and delivered against available budget — with interim risk controls in place for deferred C2 items.

04

Re-certification at every visit

Every remedial visit closes with the correct certification — so the building's compliance record reflects the current state of the installation.

01

EICR Review & Scope

We review the EICR findings, inspect the installation where required and produce an accurate remedial scope with cost before any works commence.

02

Priority Sequencing

C1 items scoped for immediate response; C2 items scheduled and phased against the available budget, with interim controls documented.

03

Remedial Works

NICEIC-approved engineers carry out defect clearance to BS 7671, with photographic records of each item before and after.

04

Re-Certification

Updated certification issued at every visit — minor works certificates, partial re-test results or updated EICR as appropriate to the scope.

1 / 4

What our clients say

Con-Tec consistently meets the rigour our estates teams expect. Their compliance documentation, site discipline and turnaround on remedial works are exactly what large-scale healthcare contracts require.

Get a Quote

Ready to Start a Project?

We respond to every commercial and industrial enquiry within one working day. Share your scope and programme and we'll come back with lead engineers, approach and a clear cost envelope.

Remedial Works | Testing & Compliance | Con-Tec Solutions