Con-Tec Solutions

Testing & Compliance Service

Fixed Wire Testing

Electrical Installation Condition Reports (EICR) for commercial, industrial and public sector premises — systematic inspection and testing to BS 7671, with prioritised C1/C2/C3 remedial schedules and digital records.

What a fixed wire testing programme actually has to deliver

01

An EICR that doesn't satisfy your insurer or landlord

Insurers, landlords and the Electricity at Work Regulations all require periodic inspection and testing of fixed electrical installations. Our EICR reports are produced to BS 7671 by qualified inspection and test engineers and carry NICEIC certification — a format that satisfies most insurer and landlord requirements.

02

Findings that are uncategorised and impossible to prioritise

An EICR that lists observations without a C1/C2/C3 classification leaves the building owner with no basis to prioritise remedial spend. Our reports categorise every finding, with a written remedial schedule ordered by priority.

03

Testing on a live site without disruption

Circuit testing typically requires brief supply interruptions. We plan all testing with the site manager and phase circuit groups to minimise the impact on occupiers — with clearly communicated outage windows and same-day restoration of every circuit.

04

Multiple sites with inconsistent documentation

Multi-site programmes require consistent methodology, comparable reports and a single documentation format. We apply standardised inspection procedures and submit reports in a uniform format — so the estate manager can compare findings directly across all sites.

NHS
Eric Wright Group
Lancaster University
Bowmer + Kirkland
Conlon Construction
Casey
Barnfield
Caddick
Northern Care Alliance
Manchester Airports Group
NHS
Eric Wright Group
Lancaster University
Bowmer + Kirkland
Conlon Construction
Casey
Barnfield
Caddick
Northern Care Alliance
Manchester Airports Group

Technical detail

Standards & compliance

  • BS 7671 18th Edition — inspection and testing
  • Electricity at Work Regulations 1989
  • IET Guidance Note 3 — inspection and testing
  • NICEIC EICR certification and registration
  • Housing Act 2004 / The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020

Inspection scope

  • Visual condition inspection of all accessible wiring
  • Distribution board and consumer unit inspection
  • Circuit continuity and insulation resistance testing
  • Earth fault loop impedance measurement
  • RCD and RCBO operating time verification

Reporting

  • Full EICR to BS 7671 Appendix 6 format
  • C1, C2, C3 and FI observations coded and described
  • Prioritised remedial schedule for the capital programme
  • Digital report delivery and record retention
  • Guidance on recommended re-inspection intervals

Testing equipment

  • Calibrated multifunction test instruments
  • Thermal imaging camera for hot-spot identification
  • Power quality monitoring on request
  • Test result digital upload and record management
  • All equipment calibrated and within certification
Con-Tec Solutions — fixed wire testing and EICR inspection

The Numbers

Buildings in a single programme

47

Multi-site EICR programme across a North West local authority's entire public estate — 47 buildings with fully consistent documentation.

Circuits tested

3,200+

Over 3,200 individual circuits inspected, tested and recorded across the 47-building programme.

Documentation rate

100%

Full EICR documentation submitted for every building, with prioritised C1/C2/C3 remedial schedules ready for the capital programme.

Why specify Con-Tec

Inspection That Produces Actionable Records

01

Qualified inspection engineers

All EICRs are carried out by directly-employed engineers qualified to BS 7671 inspection and testing standard, with NICEIC certification on every report.

02

Prioritised remedial schedules

Every EICR closes with a C1/C2/C3 classified remedial schedule in priority order — so you can plan and budget remedial works from the moment the report is received.

03

Consistent multi-site methodology

We apply the same inspection procedures, documentation templates and report format across every site in a programme — enabling direct comparison and portfolio-level risk management.

04

Remedial works capability

We carry out C1 and C2 remedial works as well as inspection. Single-contractor continuity from test through to remedial sign-off means no documentation gap and no scope interpretation issues between inspectors and contractors.

01

Programme Planning

Outage windows agreed with the site manager, circuit groups phased to minimise disruption and access arrangements confirmed before testing begins.

02

Visual Inspection

Systematic visual condition inspection of all accessible wiring, accessories, switchgear and distribution equipment.

03

Circuit Testing

Continuity, insulation resistance, earth fault loop impedance and RCD testing of every circuit, with calibrated instruments and digital result upload.

04

EICR Report & Remedial Schedule

Full EICR to BS 7671 format, with C1/C2/C3 observations classified and a written remedial schedule submitted within 5 working days.

1 / 4

What our clients say

Con-Tec consistently meets the rigour our estates teams expect. Their compliance documentation, site discipline and turnaround on remedial works are exactly what large-scale healthcare contracts require.

Get a Quote

Ready to Start a Project?

We respond to every commercial and industrial enquiry within one working day. Share your scope and programme and we'll come back with lead engineers, approach and a clear cost envelope.

Fixed Wire Testing (EICR) | Testing & Compliance | Con-Tec Solutions