Commercial and industrial solar PV installation — system design, DNO G99/G98 application, roof and ground mount installation, grid connection, commissioning and MCS-compliant documentation for commercial premises.

What a commercial solar PV project actually has to deliver

01

Grid connection that takes months and delays the project

DNO G99 applications for larger commercial installations require load flow data, protection settings and formal approval — a process that takes several months if managed reactively. We initiate the DNO application process at the outset of the design stage, so grid connection approvals are in place before equipment is ordered.

02

A design that doesn't optimise the available roof area

Panel layout, string configuration and inverter selection all affect the energy yield from a given roof area. We produce a site-specific yield model before specifying any equipment — so the system is designed to maximise output from your actual roof orientation, pitch and shading profile.

03

No monitoring to verify the system is performing

A solar PV system that is underperforming may not be immediately obvious — string faults, soiling and inverter issues reduce output silently. We commission inverter monitoring and generation data logging as part of every installation.

04

Documentation that doesn't satisfy your insurer or funder

Commercial PV installations require MCS or equivalent documentation, G99/G98 commissioning confirmations, test certificates and as-installed drawings. We produce the full documentation package at handover — in the format required by funders, insurers and building management.

NHS
Eric Wright Group
Lancaster University
Bowmer + Kirkland
Conlon Construction
Casey
Barnfield
Caddick
Northern Care Alliance
Manchester Airports Group
NHS
Eric Wright Group
Lancaster University
Bowmer + Kirkland
Conlon Construction
Casey
Barnfield
Caddick
Northern Care Alliance
Manchester Airports Group

Technical detail

Standards & compliance

  • BS 7671 18th Edition — DC and AC circuit requirements
  • Engineering Recommendation G99 / G98 — grid connection
  • IET Code of Practice for Grid Connected Solar PV Systems
  • MCS MIS 3002 installation standard
  • Planning and permitted development compliance

System design

  • Site-specific yield modelling and shading analysis
  • Panel layout and string configuration design
  • Inverter selection for string and central configurations
  • DC isolator and protection device specification
  • AC connection and export limiting design

Installation

  • Roof and ground-mount racking systems
  • DC cabling, string combiner boxes and DC isolation
  • AC circuit and inverter connection
  • Export limitation and grid protection relay installation
  • Monitoring system commissioning and data logging

Grid connection & documentation

  • DNO G99/G98 application management
  • Protection relay settings and commissioning verification
  • MCS-compliant installation certificate
  • As-installed single-line diagram
  • Handover pack and O&M documentation
Con-Tec Solutions — commercial solar PV installation

The Numbers

Grid connection standard

G99

Engineering Recommendation G99 governs grid-connected generation above 16A per phase — we manage the full application and commissioning process.

Installation standard

MCS

MCS MIS 3002 installation certification is produced at handover — required for feed-in tariff registration, export agreements and some insurance policies.

Monitored from day one

100%

Inverter monitoring and generation data logging commissioned at handover — so you have a performance baseline from the first day of generation.

Why specify Con-Tec

Generation Projects Delivered End to End

01

Early DNO application management

We initiate the G99/G98 application process at design stage — so grid approvals are in place before equipment is ordered and the project programme isn't held by network operator delays.

02

Site-specific yield modelling

Every system is designed from a site-specific yield model — accounting for your actual roof orientation, pitch, shading profile and load pattern — before any equipment is specified.

03

MCS-compliant documentation

MCS installation certificates, G99/G98 commissioning confirmations, as-installed drawings and O&M manuals produced at handover in the format required by funders, insurers and registrars.

04

Combined solar and EV capability

We design and install both solar PV and EV charging infrastructure — enabling combined export management, smart charging and on-site generation prioritisation as a single coordinated package.

01

Survey & Yield Modelling

Site survey, roof condition review, shading analysis and site-specific yield model before any design work begins.

02

Design & DNO Application

System design, panel layout, string configuration and G99/G98 application submitted to the DNO at the start of the design stage.

03

Installation

Racking, panels, DC circuits, inverter and AC connection installed to MCS and BS 7671 by NICEIC-approved engineers.

04

Commission, Test & Handover

Full commissioning, monitoring system activation, MCS certificate and documentation package at handover.

1 / 4

What our clients say

Con-Tec consistently meets the rigour our estates teams expect. Their compliance documentation, site discipline and turnaround on remedial works are exactly what large-scale healthcare contracts require.

Get a Quote

Ready to Start a Project?

We respond to every commercial and industrial enquiry within one working day. Share your scope and programme and we'll come back with lead engineers, approach and a clear cost envelope.

Solar PV | EV & Solar | Con-Tec Solutions