Con-Tec Solutions

Industrial Service

Sub-Mains Distribution

Sub-mains distribution installation and upgrades for industrial and commercial premises — from distribution board replacement through to LV cable design, MCCB specification, containment and full BS 7671 documentation.

What sub-mains distribution work actually has to deliver

01

Distribution boards that are full — no spare ways

A full distribution board with no spare capacity is a programme risk for any new load, fit-out or machine installation. We assess the existing board configuration and design an extension or replacement that provides the headroom required without oversizing the installation.

02

Cable routes that interfere with the existing plant

New sub-main cables in operating industrial environments have to be planned around existing plant, structural constraints and access restrictions. We survey cable routes before design and produce a routing plan that avoids interference with both active plant and future maintenance access.

03

Voltage drop that affects sensitive equipment

Undersized sub-main cables cause voltage drop that affects drive controllers, PLC systems and precision equipment. We calculate voltage drop across the full circuit length and specify cable sizes to maintain supply quality at the load.

04

No up-to-date single-line diagram

Many industrial sites have distribution infrastructure that has been extended over decades without updated documentation. We produce a verified single-line diagram and circuit schedule as part of every sub-mains project — giving the maintenance team a reliable baseline.

NHS
Eric Wright Group
Lancaster University
Bowmer + Kirkland
Conlon Construction
Casey
Barnfield
Caddick
Northern Care Alliance
Manchester Airports Group
NHS
Eric Wright Group
Lancaster University
Bowmer + Kirkland
Conlon Construction
Casey
Barnfield
Caddick
Northern Care Alliance
Manchester Airports Group

Technical detail

Standards & compliance

  • BS 7671 18th Edition — distribution circuit design
  • IEC 60947 — low-voltage switchgear and protection
  • Voltage drop calculation to BS 7671 Appendix 4
  • Short-circuit prospective fault current analysis
  • BS EN 60529 enclosure IP rating requirements

Distribution boards

  • Consumer unit and distribution board replacement
  • MCCB and MCB protection specification
  • RCD and RCBO protective device selection
  • Metering and sub-metering provisions
  • Arc flash boundary assessment on request

Sub-main cables

  • SWA and XLPE cable design and installation
  • Mineral insulated cable for fire-protected circuits
  • Busbar trunking systems for large load centres
  • Cable management sizing for capacity and future use
  • Cable tagging, labelling and schedule production

Documentation

  • As-installed single-line diagrams
  • Circuit schedules and distribution board records
  • BS 7671 test certificates and EICR
  • Prospective fault current and voltage drop schedules
  • O&M documentation for facilities management
Con-Tec Solutions — industrial distribution installation

The Numbers

Edition BS 7671

18th

All sub-main designs comply with the current edition of the IET Wiring Regulations including Amendment 2.

Unplanned outages

0

Zero unplanned supply interruptions is the standard we hold every live-site distribution project to.

Documentation turnaround

48hr

Single-line diagrams, circuit schedules and test certificates submitted within 48 hours of commissioning.

Why specify Con-Tec

Distribution Infrastructure Built to Last

01

Pre-works capacity analysis

We assess the existing supply capacity, prospective fault current levels and earthing arrangements before any design begins — so the scope is fully understood from day one.

02

Voltage drop compliance by calculation

Cable sizes are chosen by calculation against the full circuit length and load — not by rule of thumb. Voltage drop schedules are included in the handover documentation.

03

Live-site delivery capability

Sub-mains work on live industrial sites requires careful isolation planning and temporary supply management. We plan every isolation with the client's safety team before any work commences.

04

Single-line diagram at handover

Every project closes out with a verified, as-installed single-line diagram and circuit schedule — the foundation of your electrical safety and maintenance record.

01

Capacity Assessment

Supply capacity review, prospective fault current analysis and existing circuit condition assessment before design begins.

02

Design & Cable Schedule

Distribution board design, cable sizing, voltage drop calculation and routing plan produced and submitted for approval.

03

Installation

Works delivered with careful isolation management, temporary supply planning and zero unplanned outages as the standard.

04

Commission, Test & Document

Full BS 7671 testing, single-line diagram production and circuit schedule submission within 48 hours of commissioning.

1 / 4

What our clients say

Con-Tec consistently meets the rigour our estates teams expect. Their compliance documentation, site discipline and turnaround on remedial works are exactly what large-scale healthcare contracts require.

Get a Quote

Ready to Start a Project?

We respond to every commercial and industrial enquiry within one working day. Share your scope and programme and we'll come back with lead engineers, approach and a clear cost envelope.

Sub-Mains Distribution | Industrial Electrical | Con-Tec Solutions