Critical care distribution upgrade

12 monthsBS 7671 / HTMLive site
Programme duration

12mo

Phased across 12 months to avoid clinical disruption — sequenced around ward closures and NHS Estates maintenance windows.

Distributions replaced

3

Three main distribution boards upgraded to modern MCCB panels, fully rated and documented to HTM 06-01 healthcare guidance.

Unplanned outages

0

Zero unplanned supply interruptions across the full programme on a live acute site with 24-hour clinical operations.

The Challenge

Replacing live distribution infrastructure on an acute hospital site requires more than technical competence. It demands clinical awareness, zero-tolerance for unplanned outages, and meticulous coordination with NHS Estates, ward managers and infection control — across a 12-month programme with no margin for error.

HTM 06-01 Compliance

Healthcare Technical Memorandum 06-01 sets the standard for electrical distribution in NHS facilities. Every design decision — from board specification to cable sizing and earthing arrangements — was validated against HTM requirements and independently verified before installation began.

Electrical inspection and test documentation on a healthcare site

Phased Programme Management

Works were sequenced around clinical rotas, maintenance windows and infection control protocols. Each phase was signed off by the Con-Tec project team and NHS Estates before energisation, with a full audit trail of test results and commissioning documentation passed to the Trust on completion.

Healthcare distribution board installation on a live hospital ward
Emergency lighting system testing in a clinical corridor
Motor control centre installation detail
Zero unplanned outages across a 12-month programme on a live acute site. That is the standard we held ourselves to — and delivered.

Con-Tec Project Director

The Outcome

Three main distribution boards replaced, full EICR sign-off across all circuits, and a comprehensive documentation package — including updated single-line diagrams, test certificates and O&M manuals — handed to the Trust's Estates team on completion, fully compliant with the NHS asset register format.

Get a Quote